How On-Site Power Generation Adds New Risks to AI Data Centers
(No Ratings Yet)
5 views
Embed Video
Use the below code to add this video to your website.
As AI data centers turn to on-site power generation to overcome grid connection delays, insurers face increasingly complex risks involving critical infrastructure, operational reliability, and the synchronization of power systems with data center operations. Watch this clip from the latest Between the Lines episode with host Elizabeth Blosfield as she talks with Stuart Adam, Head of Natural Resources, Howden US. To watch the full episode, visit https://www.carriermanagement.com/research/research/the-physical-risks-behind-the-ai-data-center-boom/